Economic Development

Available Property

Silver State Trucking

Silver State Trucking recently shut down after the owner passed away. Currently these facilities located on over three acres with easy access to Interstate 80 and the railways are being leased out. At this time the three center bays in the main building, a manufactured home for office or residence, and the warehouse in the rear of the property are all available.

Infrastructure Upgrade

The Town of Battle Mountain operates a state of the art wastewater treatment facility that was constructed in 2002. This plant was designed by Shaw Engineering, Reno. The facility produces a high quality effluent and includes influent screening, two sequential batch reactor tanks, an aerobic sludge digester, biosolids press and chlorine contact tank. The facility currently treats approximately 400,000 gallons per day, however, the wastewater treatment plant currently has a capacity for 800,000 gallons per day. Additionally, engineering has been completed and provisions have been made allowing the plant to be easily expanded to 1,200,000 gallons per day. There is plenty of excess capacity available to easily serve future growth in the area with this facility.